Including today's downpour, the GTA has had about 1o inches of rain since June 1.
As a result I've had to redesign the hot tub we were installing in our backyard.
There is now a canal built into the hot tub to accommodate excess water due to the environment.
In addition, a series of lift locks are being installed to assist entering and exiting the tub.
The project should be finished some time this fall before hurricane hits Toronto.
I'm moving!
-
I've decided to incoporate by Maple Leafs blog with my other blog - Canada,
eh?
Since the Curse of Frank Mahovlich lives on I feel compelled to contin...
12 years ago